ACS Construction Group has been instrumental in providing the design and construction of the drainage, roads and street lighting and signage required for the initial phase of development.

Since being appointed as main contractor last year, ACS Construction Group has provided the following services:

• Demolition and remediation of farm buildings and yards

• Earthworks to facilitate the required infrastructure

• New storm and foul drainage systems

• New roads and footways required by Section 38 of the planning permission

• Adaptation and improvement of existing highways required by Section 278 of the planning permission

• Diversion of Statutory Undertaker’s existing equipment / apparatus (water, gas and comms)

• Builders work to accommodate new services into the site and to each development plot

• Street lighting and signage