Project Detailsx

Client:Longbridge Town
Category:Commercial

Year Completed:2013

Project Overviewx

The works have involved the installation of over 1,160m of drainage and 38Nr manholes at depths of up to 5.5m. Over half of this drainage was 900mm diameter concrete pipes for a Surface Water Sewer.

These works, carried out over a three month period, were completed on time, to a high quality, and with minimum disruption to all third parties.

A significant portion of this work was carried out in a live carriageway environment, in a very busy location, adjacent to the entrance to the development. This work therefore involved a significant interface with the general public in terms of both pedestrian and traffic management.