30
Nov

Progress update at Hull University

ACS has completed the groundworks and concrete raft slabs (placing over 1500m3 of concrete) to the first 4 blocks of the student accommodation, we are also on programme with the concurrent construction of the next 3 blocks.

ACS and Vinci achieved the first milestone handover of the new link road and bus turning circle on the Friday 4th November on which was a very challenging programme and handed over virtually snag free.

ACS has also commenced works to the multi service trench which links between each of the buildings to provide heating, water, comms and electric.  Again this is a challenging task co-ordinating and working alongside all other trades.

We have also completed both of the onsite substations and associated H/V ducting routes on programme for the following trades to work towards achieving power on site for Christmas.

multi service trench
Multi service trench at Hull University