15
Mar

High Bay Warehouse, Macclesfield

ACS have been involved with the new high bay warehouse slab works on a pharmaceutical campus in Macclesfield.

The location of the works were within a highly sensitive area.

The size of the new slab was 1800 m sq. at a depth of 450mm with over 800m cube of concrete over 4 pours.

ACS were involved with the development of the specifications and risk assessments to ensure the noise and vibration levels were kept to a minimum so the disruption of the pharmaceutical production programme was kept to a minimum.

For more information regarding this project, click here.