    May

    ACS secures new scheme for leading pharmaceutical

    ACS has secured a new scheme working for a leading pharmaceutical company in Hull. The project involves the breaking out and removal of existing concrete slab, installation of new drainage system, construction of concrete slab and external works. The adjacent pharmaceutical factory will remain live throughout the project, so...

    Read More
  • 18
    Apr

    ACS secures Fallowfield Owens Park Campus

    ACS has secured the Fallowfield Owens Park Campus full Groundworks and Substructure package carrying out works for Vinci Construction.  This large student accommodation site will eventually provide a state of the art student accommodation facility for Manchester University in the South Manchester student corridor.  ACS are proud to be...

    Read More
  • 12
    Apr

    Biggest concrete pour of 265m3 at Hull University

    ACS has just completed the biggest concrete pour of 265m3 at Hull University today.

    Read More
  • 05
    Apr

    Progress update at Harrogate Bus Station

    Night shift at Harrogate Bus Station to lay ducts whilst the buses weren’t running.  ACS has been working with Centrica and Transdev to complete the installation of an electric bus charging station at Harrogate Bus Station.  This is the first of its kind in the UK to utilise ‘opportunity...

    Read More
  • 10
    Jan

    Cardinal Maritime Handover

    ACS Construction Group Ltd are delighted that their Build and Civil Engineering divisions have handed over a new warehouse and office facility for Cardinal Maritime Ltd at Sharston Manchester.  Works were completed on time with phased handovers to assist our client allowing early access to the building. This full...

    Read More
  • 21
    Dec

    Block E slab rebar fixing

    Block E Slab Rebar Fixing progressing safely and on programme at Hull University. Block E will be poured in two stages which will allow sectional handover to the Structural Steel Contractor.

    Read More
  • 30
    Nov

    Progress update at Hull University

    ACS has completed the groundworks and concrete raft slabs (placing over 1500m3 of concrete) to the first 4 blocks of the student accommodation, we are also on programme with the concurrent construction of the next 3 blocks. ACS and Vinci achieved the first milestone handover of the new link...

    Read More
  • 10
    Nov

    ACS complete design and construction project at Lee Valley Caravan Park

    ACS have completed the design and construction of the Final Phase works comprising 63 No. static caravan bases, access/service road, car park hardstandings and refuge areas along with all associated services, drainage and landscaping works at Lee Valley Caravan Park. Click here for more info about Lee Valley Caravan...

    Read More
  • 27
    Sep

    ACS awarded £6m civils package at Hull Uni

    This project comprises the civil and structural foundations, drainage, enabling and hard landscaping works of 9 new residential blocks at the University of Hull, together forming their West Campus Residencies Project (WCRP) and providing approximately 1450 new self-catering bed spaces.

    Read More
  • 31
    Mar

    ACS awarded a £1.9M civils package at Lee Valley

    ACS Construction Group have just been awarded a £1.9M civil engineering design and build contract acting as Principle Contractor for Lee Valley Park Authority – http://www.leevalleypark.org.uk/